Warehouse, Glasgow
About this project
This project in Glasgow was for a private client.
Jumbo Stud Ltd. was instructed to build three jumbo stud wall partitions to divide a warehouse into four separate units.
Jumbo Stud used an SFS framing system together with a robust Fermacell board to separate the warehouse and to give 60 minutes of protection from one to the other.
- F60 Jumbo Stud system was used to give 60 minutes fire protection and 54dB sound reduction.
- SFS high bay wall was built up to 7m.
- Rockwool RWA45mm insulation was used in the cavity to comply with the full specification of this partition.
Would you like to see more of our jumbo stud wall partitioning projects?
Back to Projects
