• Jumbo Stud Partitions

    Jumbo Stud Partitions

    High Bay, SFS framing and fire wall partition solutions

Jumbo stud partitions and high bay wall solutions supplied and installed throughout the UK.

Our jumbo stud wall partitions will suit any building and are designed to accommodate wind pressure loadings, wall height, fire ratings and acoustic ratings. Other considerations include building control requirements, building deflection, heavy industrial traffic effects and more. Just get in touch with the details of your project and we'll provide a full quotation of works. If you are ready order please see our order page for more information.

20 Year Warranty Supported by Fermacell

Our Jumbo Stud wall partition systems come with a 20 year warranty supported by Fermacell boasting excellent acoustic and thermal properties. We can typically supply, install and commission within 2 weeks of an order being placed. For our high bay wall solutions see our High Bay page

Our solutions have so many advantages ideal for many different types of building including, but not limited to, commercial/industrial units, hospitals, education establishments, sports halls, timber framed buildings and residential.

Recent Projects

Homebase / Lidl, Horsham

Homebase / Lidl, Horsham

Dawes Farm required us to build and install jumbo stud F60S, 60 min fire rated partition wall.

Read More
Homebase / Lidl, Cambridge

Homebase / Lidl, Cambridge

We were contracted to build 2 dividing walls into the existing Homebase store to provide a new space for the new Lidl Store.

Read More
Kirkman and Jourdain, London

Kirkman and Jourdain, London

100m long and 11m high jumbo stud partitions installed at warehouse for Kirkman and Jourdain in London

Read More
Would you like to see more of our jumbo stud wall partitioning projects?
See More Projects

About Us

Design

Jumbo Stud structural engineers design each installation separately. The Fermacell partitions are designed to suit the layout and configuration of each building. Our solutions are over engineered so that they never fail.

Certification

Our partition walls are backed by Warrington Fire Certification and where special extreme designs are required further testing can be carried out to obtain the necessary certification.

Installation

Installations managed by Jumbo Stud's highly trained professional workforce regularly praised by clients. Typically we can be on site within 7 day for UK projects with international projects having longer lead times due to transportation of materials

Warranty

In addition to the Warrington Fire Certification, our partitions also come with a warranty supporting both materials and labour for each project

About Us