Acoustic Partition for 1st European Games in Baku

  • Wall was 140 long and 26 high.
  • Build in 3 weeks time with 14 contractors on site.
  • The system used was based on the F60S Jumbo Partitions but this wall couldn’t be fireproof because of the height.
  • Wall passed test for 54db

After the games, we took down wall and restore material on pallet in 10 days with only 12 men on site.

 

Date: 2015
Location: Baku, Azerbaijan