About this project

 Jumbo Stud Ltd were asked to build two high bay partitions. 1 hour fire rated F60S Jumbo Partitions divided a warehouse into 3 separate units. Highest point of the partitions was 12.5m.

Our the wall partitions required special head deflection detail to achieve fire resistance at the top of the wall. Both jumbo stud partitions were built to the 3m high block wall.

One end of the wall was built above existing office, making the project more challenging. We took care of the perfect finish applying Fermacell final surface treatment called FST. Both of the walls were finished up to smooth painted finish.

We used a paint sprayer to give a very smooth finish to our partitions and we had only 3 weeks to build both partitions together with deflection head. Using a system based on ultimate Fermacell performance board and 75mm Rockwool mineral wool insulation slab between we were able to provide 54db of sound proofing too.

Due to our performance and build time the client also asked us to provide 1 hour fire resistance to structural columns in the warehouse. The firecasing of 19 columns with a smooth painted finish took us only another couple days to complete.

We finished on time with customer satisfaction.

 

Date: 2016
Location: Horsham, West Sussex